Typical timelines
A pilot pack is typically about 2–4 weeks once the supplier cooperates. A full plot set takes longer, especially for smallholder coffee or cocoa with many polygons. Geodata collection is often the slow step — plan weeks, not days.
NusaProof
EU operators placing relevant commodities on the market need plot-level geolocation, legality evidence and a deforestation-free check against 31 December 2020. We work in Indonesia to collect and structure that evidence. You remain the operator: you file your own DDS in TRACES. This is not legal advice.
Commodity, supplier, product line vs full plot set, EU vs dual EU/US use of the same dataset.
Documents and geodata from the supplier; licensed local partners where a formal survey is required.
Deforestation plausibility against the 31 Dec 2020 cut-off; legality papers reviewed and gaps listed.
Structured pack plus methodology. You assess and, if you proceed, file the DDS yourself.
A pilot pack is typically about 2–4 weeks once the supplier cooperates. A full plot set takes longer, especially for smallholder coffee or cocoa with many polygons. Geodata collection is often the slow step — plan weeks, not days.
SVLK/V-Legal supports legality. Plots, species and the 31 Dec 2020 forest-degradation/deforestation check still have to be evidenced. Timber already under the EUTR follows the 30 Dec 2026 application date even for micro and small operators.
Estate vs smallholder mix matters: many small plots, often without formal boundaries, consolidated at mill or exporter. Green and roasted coffee are in the current Annex I discussion; the Commission page states that soluble coffee added by Delegated Regulation (EU) 2026/2102 is described as applying from 30 December 2027. Verify the current list.
Similar smallholder aggregation. We map what the exporter can actually show — farm lists, polygons, and where lots are blended.
Plot-level evidence through collection points and processors. Mixing lots without identity is a common gap we document rather than paper over.
Scoped tightly for SME importers; majors often already have programmes. The Commission page notes that certain palm-oil derivatives added by Delegated Regulation (EU) 2026/2102 are described as applying from 30 December 2027. Not legal advice — confirm the product list in force for your CN codes.
Pilot (one supplier, one product line) or full supplier plot set. Monitoring is a separate monthly retainer. You always receive a written scope before we start. We do not file the DDS for you.
Introductory from €1,500 (founding from €1,050) — one supplier, one product line, documents + GeoJSON + satellite check, typically 2–4 weeks.
From €3,500 — all plots of one supplier, legality check, chain of custody, EUDR + Lacey-ready data where relevant.
From €290/month — per-shipment updates, new plots and documents, periodic satellite re-check.
Introductory “from” prices. The final fee is set after a written scope. Travel outside the Lombok, Bali and Java metro areas is billed separately. Not a binding offer.
Founding-client offer: the first five projects receive 30% off the first project, in exchange for process feedback.
Application dates and the deforestation cut-off, as set out in Regulation (EU) 2023/1115 as amended by Regulation (EU) 2025/2650 and summarised on the European Commission page. This is not legal advice — verify the current legal text.
30 Dec 2026
Main EUDR obligations apply, including due diligence and due diligence statements.
30 Jun 2027
Deferred application for micro and small operators, except timber already covered by the EUTR.
30 Dec 2026
Timber products already covered by the EU Timber Regulation follow this earlier date.
31 Dec 2020
Relevant commodities must be deforestation-free after this cut-off. It is a land-use reference date, separate from when obligations start to apply.
Legal basis: Regulation (EU) 2023/1115 as amended by Regulation (EU) 2025/2650.
European Commission — deforestation-free productsEUR-Lex: Regulation (EU) 2025/2650Delegated Regulation (EU) 2026/2102
The Commission page states that products added by Delegated Regulation (EU) 2026/2102 (for example soluble coffee and certain palm-oil derivatives) apply from 30 December 2027, to give businesses time to prepare. Confirm against the current legal text; this site is not legal advice.
No. Due diligence and filing the DDS in TRACES remain with the operator. We provide evidence from Indonesia and document our methodology so you can use it in your system. Legal responsibility cannot be transferred.
Large and medium operators: 30 December 2026. Micro and small operators: 30 June 2027. Timber already covered by the EUTR: 30 December 2026. Cut-off for deforestation: 31 December 2020. Always verify the current legal text.
Indonesia is classified as standard risk under the EU benchmarking. Full due diligence applies; the low-risk simplified path does not.
SVLK is important legality evidence but does not replace plot geolocation or deforestation-free verification against 31 Dec 2020.
Find and shortlist manufacturers and traders in Indonesia against your product, volume, quality and price brief — with company-registry checks and a comparison table.
Details →Legal-document and licence checks (e.g. NIB, SVLK/V-Legal where relevant, export permits, company registry extracts) with a clear findings memo.
Details →Independent assessment of capacity, equipment, quality systems, labour practices and samples. Documented with photos, video and a written report — not an official certification.
Details →